Everything seems to fit after cutting 5 of length out of the rear kick up.
Date: 09/22/2012
Views: 493
|
Hopefully my seat turns out better then this.
Date: 09/22/2012
Views: 460
|
Plasma cut some brackets for the four link ready for grinding.
Date: 09/22/2012
Views: 471
|
Triangulated 4 link for the rear end cut and tacked in place. Recycled from the old mustang 2 four bar front end.
Date: 09/22/2012
Views: 483
|
Top and bottom links done!
Date: 09/22/2012
Views: 462
|
Fabricated some top coil over mounts and integrated the bottom mounts into the bottom four link mounts.
Date: 09/22/2012
Views: 462
|
After much design, (Thanks Jet, Brian, Poppy) Thought and fabrication the rear end is done.
Date: 09/22/2012
Views: 436
|
New 36 radius rods in and ready to go.
Date: 09/22/2012
Views: 491
|
Roller!
Date: 09/22/2012
Views: 440
|