|
Fixturing up the frame rails so they are square & parallel.
Date: 01/25/2004
Views: 693
|
From the other end.
Date: 01/25/2004
Views: 639
|
My son Jayson doing some grinding on the frame welds.
Date: 01/25/2004
Views: 614
|
|
His friend Miles helping out.
Date: 01/25/2004
Views: 624
|
And another friend, Ryan, pitching in.
Date: 01/25/2004
Views: 638
|
Frame done with a coat of Rustoleum. I put a 13" "Z" in it. Now I need some 4-link brackets & tabs to mount t
Date: 01/25/2004
Views: 653
|
|
Frame with 4-links on brackets. Top links are about 12" long, botom ones are about 19" long.
Date: 02/01/2004
Views: 655
|
4-link attached to rear-end.
Date: 02/01/2004
Views: 687
|
20 minutes later, panhard bar mounted. I put in a series of holes on the brackets on the rear-end to be able to adjust how much
Date: 02/01/2004
Views: 813
|